10. On Beacon Hill Tunnel the work of heading driving was carried on right through with very good
results. As much as 96 feet was driven during China New Year week. The work of widening out however had to
stop as sufficient coolies could not be kept on to do
this. The progress diagram shews the North side lined
right up to the shaft.
11.
r.Barry on his inspection decided that it
would be risky to leave the tunnel unlined even on the
hard places as there was always a chance of a piece of rock
shaking out and falling on a passing train. It was there-
fore decided to put up a thin facework on the sides so
as to give an even support to the arch. It has been
found impossible on this Tunnel to dress a suitable place
to spring a flying arch from.
12. The following shews the progress on tabular
form.
HEADINGS
Total.
South Side
North Side
Grand Total
LINING
South Side
North Side
Grand Total
-6-
2,700 feet
Progress
172 feet
3,291 feet 175 feet
5,991 feet
347 feet
Total.
1,590 feet
Progress
75 feet
1,275 feat 60 feet
2,865 feet
135 fest
Widening